Project Description
PRODUCTION OF DOMESTIC HOT WATER (DHW) WITH HEAT RECOVERY AND IMPROVED PERFORMANCE OF WATER-COOLED CHILLER OF ATHENAEUM INTERCONTINENTAL HOTEL
The energy upgrade works of the Main Plant Room are summarized:
Complete Installation of a high performance water-cooled chiller producing cold and hot water (Heat Recovery).
New plate heat exchanger.
Piping system of suitable connections: Production and Storage of hot water.
Cooling Tower Water Piping and Condenser Water Pump Inverter drive adjustment.
Recording of thermal and electrical energy.
New Plant room Control System.
Monitoring – operation optimization.